beschreibung The traditional construction of bolt sphere grid has many disadvantages, such as high cost, large amount of work at high altitude and long construction period, in order to make up for these shortcomings, in this paper, a new and applicable construction method is explored: setting up local scaffolding, installing the bolt sphere grid starting frame on the local scaffolding, then the pre assembled unit of bolt sphere grid is assembled on the ground, using small hoisting equipment to lift pre assembled unit to high altitude and install. Compared with the traditional installation method, the construction method has strong practicability and high economic efficiency, and has achieved good social and economic benefits.
citation_standardnr 6216615
datenlieferant ipn_articles
feed_id 108844
feed_publisher Institute of Physics (IOP)
feed_publisher_url http://www.iop.org/
insertion_date 2018-03-24
journaleissn 1755-1315
journalissn 1755-1307
publikationsjahr_anzeige 2018
publikationsjahr_facette 2018
publikationsjahr_intervall 7984:2015-2019
publikationsjahr_sort 2018
publisher Institute of Physics (IOP)
quelle IOP Conference Series: Earth and Environmental Science
relation http://iopscience.iop.org/1755-1315/128/1/012090
search_space articles
shingle_author_1 L W Hu, F L Guo, J L Wang and F M Bu
shingle_author_2 L W Hu, F L Guo, J L Wang and F M Bu
shingle_author_3 L W Hu, F L Guo, J L Wang and F M Bu
shingle_author_4 L W Hu, F L Guo, J L Wang and F M Bu
shingle_catch_all_1 Construction method of pre assembled unit of bolt sphere grid
The traditional construction of bolt sphere grid has many disadvantages, such as high cost, large amount of work at high altitude and long construction period, in order to make up for these shortcomings, in this paper, a new and applicable construction method is explored: setting up local scaffolding, installing the bolt sphere grid starting frame on the local scaffolding, then the pre assembled unit of bolt sphere grid is assembled on the ground, using small hoisting equipment to lift pre assembled unit to high altitude and install. Compared with the traditional installation method, the construction method has strong practicability and high economic efficiency, and has achieved good social and economic benefits.
L W Hu, F L Guo, J L Wang and F M Bu
Institute of Physics (IOP)
1755-1307
17551307
1755-1315
17551315
shingle_catch_all_2 Construction method of pre assembled unit of bolt sphere grid
The traditional construction of bolt sphere grid has many disadvantages, such as high cost, large amount of work at high altitude and long construction period, in order to make up for these shortcomings, in this paper, a new and applicable construction method is explored: setting up local scaffolding, installing the bolt sphere grid starting frame on the local scaffolding, then the pre assembled unit of bolt sphere grid is assembled on the ground, using small hoisting equipment to lift pre assembled unit to high altitude and install. Compared with the traditional installation method, the construction method has strong practicability and high economic efficiency, and has achieved good social and economic benefits.
L W Hu, F L Guo, J L Wang and F M Bu
Institute of Physics (IOP)
1755-1307
17551307
1755-1315
17551315
shingle_catch_all_3 Construction method of pre assembled unit of bolt sphere grid
The traditional construction of bolt sphere grid has many disadvantages, such as high cost, large amount of work at high altitude and long construction period, in order to make up for these shortcomings, in this paper, a new and applicable construction method is explored: setting up local scaffolding, installing the bolt sphere grid starting frame on the local scaffolding, then the pre assembled unit of bolt sphere grid is assembled on the ground, using small hoisting equipment to lift pre assembled unit to high altitude and install. Compared with the traditional installation method, the construction method has strong practicability and high economic efficiency, and has achieved good social and economic benefits.
L W Hu, F L Guo, J L Wang and F M Bu
Institute of Physics (IOP)
1755-1307
17551307
1755-1315
17551315
shingle_catch_all_4 Construction method of pre assembled unit of bolt sphere grid
The traditional construction of bolt sphere grid has many disadvantages, such as high cost, large amount of work at high altitude and long construction period, in order to make up for these shortcomings, in this paper, a new and applicable construction method is explored: setting up local scaffolding, installing the bolt sphere grid starting frame on the local scaffolding, then the pre assembled unit of bolt sphere grid is assembled on the ground, using small hoisting equipment to lift pre assembled unit to high altitude and install. Compared with the traditional installation method, the construction method has strong practicability and high economic efficiency, and has achieved good social and economic benefits.
L W Hu, F L Guo, J L Wang and F M Bu
Institute of Physics (IOP)
1755-1307
17551307
1755-1315
17551315
shingle_title_1 Construction method of pre assembled unit of bolt sphere grid
shingle_title_2 Construction method of pre assembled unit of bolt sphere grid
shingle_title_3 Construction method of pre assembled unit of bolt sphere grid
shingle_title_4 Construction method of pre assembled unit of bolt sphere grid
timestamp 2025-06-30T23:33:48.288Z
titel Construction method of pre assembled unit of bolt sphere grid
titel_suche Construction method of pre assembled unit of bolt sphere grid
topic R
TE-TZ
U
uid ipn_articles_6216615