Construction method of pre assembled unit of bolt sphere grid
Publication Date: |
2018-03-24
|
---|---|
Publisher: |
Institute of Physics (IOP)
|
Print ISSN: |
1755-1307
|
Electronic ISSN: |
1755-1315
|
Topics: |
Geography
Geosciences
Physics
|
Published by: |
_version_ | 1836398861271171072 |
---|---|
autor | L W Hu, F L Guo, J L Wang and F M Bu |
beschreibung | The traditional construction of bolt sphere grid has many disadvantages, such as high cost, large amount of work at high altitude and long construction period, in order to make up for these shortcomings, in this paper, a new and applicable construction method is explored: setting up local scaffolding, installing the bolt sphere grid starting frame on the local scaffolding, then the pre assembled unit of bolt sphere grid is assembled on the ground, using small hoisting equipment to lift pre assembled unit to high altitude and install. Compared with the traditional installation method, the construction method has strong practicability and high economic efficiency, and has achieved good social and economic benefits. |
citation_standardnr | 6216615 |
datenlieferant | ipn_articles |
feed_id | 108844 |
feed_publisher | Institute of Physics (IOP) |
feed_publisher_url | http://www.iop.org/ |
insertion_date | 2018-03-24 |
journaleissn | 1755-1315 |
journalissn | 1755-1307 |
publikationsjahr_anzeige | 2018 |
publikationsjahr_facette | 2018 |
publikationsjahr_intervall | 7984:2015-2019 |
publikationsjahr_sort | 2018 |
publisher | Institute of Physics (IOP) |
quelle | IOP Conference Series: Earth and Environmental Science |
relation | http://iopscience.iop.org/1755-1315/128/1/012090 |
search_space | articles |
shingle_author_1 | L W Hu, F L Guo, J L Wang and F M Bu |
shingle_author_2 | L W Hu, F L Guo, J L Wang and F M Bu |
shingle_author_3 | L W Hu, F L Guo, J L Wang and F M Bu |
shingle_author_4 | L W Hu, F L Guo, J L Wang and F M Bu |
shingle_catch_all_1 | Construction method of pre assembled unit of bolt sphere grid The traditional construction of bolt sphere grid has many disadvantages, such as high cost, large amount of work at high altitude and long construction period, in order to make up for these shortcomings, in this paper, a new and applicable construction method is explored: setting up local scaffolding, installing the bolt sphere grid starting frame on the local scaffolding, then the pre assembled unit of bolt sphere grid is assembled on the ground, using small hoisting equipment to lift pre assembled unit to high altitude and install. Compared with the traditional installation method, the construction method has strong practicability and high economic efficiency, and has achieved good social and economic benefits. L W Hu, F L Guo, J L Wang and F M Bu Institute of Physics (IOP) 1755-1307 17551307 1755-1315 17551315 |
shingle_catch_all_2 | Construction method of pre assembled unit of bolt sphere grid The traditional construction of bolt sphere grid has many disadvantages, such as high cost, large amount of work at high altitude and long construction period, in order to make up for these shortcomings, in this paper, a new and applicable construction method is explored: setting up local scaffolding, installing the bolt sphere grid starting frame on the local scaffolding, then the pre assembled unit of bolt sphere grid is assembled on the ground, using small hoisting equipment to lift pre assembled unit to high altitude and install. Compared with the traditional installation method, the construction method has strong practicability and high economic efficiency, and has achieved good social and economic benefits. L W Hu, F L Guo, J L Wang and F M Bu Institute of Physics (IOP) 1755-1307 17551307 1755-1315 17551315 |
shingle_catch_all_3 | Construction method of pre assembled unit of bolt sphere grid The traditional construction of bolt sphere grid has many disadvantages, such as high cost, large amount of work at high altitude and long construction period, in order to make up for these shortcomings, in this paper, a new and applicable construction method is explored: setting up local scaffolding, installing the bolt sphere grid starting frame on the local scaffolding, then the pre assembled unit of bolt sphere grid is assembled on the ground, using small hoisting equipment to lift pre assembled unit to high altitude and install. Compared with the traditional installation method, the construction method has strong practicability and high economic efficiency, and has achieved good social and economic benefits. L W Hu, F L Guo, J L Wang and F M Bu Institute of Physics (IOP) 1755-1307 17551307 1755-1315 17551315 |
shingle_catch_all_4 | Construction method of pre assembled unit of bolt sphere grid The traditional construction of bolt sphere grid has many disadvantages, such as high cost, large amount of work at high altitude and long construction period, in order to make up for these shortcomings, in this paper, a new and applicable construction method is explored: setting up local scaffolding, installing the bolt sphere grid starting frame on the local scaffolding, then the pre assembled unit of bolt sphere grid is assembled on the ground, using small hoisting equipment to lift pre assembled unit to high altitude and install. Compared with the traditional installation method, the construction method has strong practicability and high economic efficiency, and has achieved good social and economic benefits. L W Hu, F L Guo, J L Wang and F M Bu Institute of Physics (IOP) 1755-1307 17551307 1755-1315 17551315 |
shingle_title_1 | Construction method of pre assembled unit of bolt sphere grid |
shingle_title_2 | Construction method of pre assembled unit of bolt sphere grid |
shingle_title_3 | Construction method of pre assembled unit of bolt sphere grid |
shingle_title_4 | Construction method of pre assembled unit of bolt sphere grid |
timestamp | 2025-06-30T23:33:48.288Z |
titel | Construction method of pre assembled unit of bolt sphere grid |
titel_suche | Construction method of pre assembled unit of bolt sphere grid |
topic | R TE-TZ U |
uid | ipn_articles_6216615 |